Lesson 1 of 9 · 2 min
COSWP — Code of Safe Working Practices for Merchant Seafarers
| Topic | Key COSWP requirement |
|---|---|
| Risk assessments | Required for all work activities (Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997) — routine work under standing assessments, every non-routine task assessed before it starts. Identify hazards, assess likelihood and severity, apply controls, record and review. Work must not proceed until residual risk is acceptable |
| Permit to Work | Required for high-risk operations — enclosed space entry, working aloft, hot work, work over the side. Formal record that controls are in place |
| PPE | Employer must provide suitable PPE at no cost to the seafarer. Seafarer must use it correctly |
| Working aloft | Permit to work required. Risk assessment. Harness and lifeline. No work during heavy weather or at sea in adverse conditions without specific risk assessment |
| Enclosed space entry | Never enter an enclosed space without a permit to work. Test atmosphere (O₂, flammable gases, toxic gases) before entry. Standby person at entry point. Rescue equipment ready. Continuous ventilation. UK law: the Merchant Shipping and Fishing Vessels (Entry into Enclosed Spaces) Regulations 2022, guidance MGN 659; SOLAS III/19 requires an enclosed-space entry and rescue drill at least every two months |
| Mooring operations | Treat the whole mooring deck as a potential snap-back zone — COSWP now advises against relying on painted snap-back markings, which give a false sense of security. Never stand in the bight of a line. Never put body parts through a closed fairlead. Hard hats and gloves to be worn |
See it
Permit to work: checked, signed, time-limited, closed out
A permit is a formal record that the controls are in place before high-risk work starts. Step through it and see where the work is held.
Step 1: Permit required
High-risk operations.
- Enclosed space entry
- Working aloft
- Hot work
- Work over the side
Step 2: Formal check, BEFORE work starts
Isolations, atmosphere, equipment and rescue arrangements exist.
Step 3: Signed
Hold
Work must not begin until the permit is signed off.
Step 4: Work, time-limited
The permit is time-limited.
Step 5: Closed out
Cancelled when the work is complete and the area is confirmed safe.
5/5Closed out. The permit is cancelled when the work is complete and the area is confirmed safe.
Schematic · no real permit form implied · COSWP as given on the module sheet · your vessel's SMS and permit forms govern
Say it out loud. Talk “Working aloft and over the side” through with the live Tutor.