← All study modules
OOW study module 16 of 23

COSWP · Publications · Salvage · MLC

Code of Safe Working Practices · MSNs, MGNs, MINs · Salvage law · MLC 2006 · Crew agreements

9 lessonsabout 11 min reading5 visuals and tools10 scenario questions5 oral questions

0 of 9 lessons done0%

Progress is saved on this device. Sign in to keep it on every device.

Lesson 1 of 9 · 2 min

COSWP — Code of Safe Working Practices for Merchant Seafarers

TopicKey COSWP requirement
Risk assessmentsRequired for all work activities (Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997) — routine work under standing assessments, every non-routine task assessed before it starts. Identify hazards, assess likelihood and severity, apply controls, record and review. Work must not proceed until residual risk is acceptable
Permit to WorkRequired for high-risk operations — enclosed space entry, working aloft, hot work, work over the side. Formal record that controls are in place
PPEEmployer must provide suitable PPE at no cost to the seafarer. Seafarer must use it correctly
Working aloftPermit to work required. Risk assessment. Harness and lifeline. No work during heavy weather or at sea in adverse conditions without specific risk assessment
Enclosed space entryNever enter an enclosed space without a permit to work. Test atmosphere (O₂, flammable gases, toxic gases) before entry. Standby person at entry point. Rescue equipment ready. Continuous ventilation. UK law: the Merchant Shipping and Fishing Vessels (Entry into Enclosed Spaces) Regulations 2022, guidance MGN 659; SOLAS III/19 requires an enclosed-space entry and rescue drill at least every two months
Mooring operationsTreat the whole mooring deck as a potential snap-back zone — COSWP now advises against relying on painted snap-back markings, which give a false sense of security. Never stand in the bight of a line. Never put body parts through a closed fairlead. Hard hats and gloves to be worn

See it

Permit to work: checked, signed, time-limited, closed out

A permit is a formal record that the controls are in place before high-risk work starts. Step through it and see where the work is held.

  1. Step 1: Permit required

    High-risk operations.

    • Enclosed space entry
    • Working aloft
    • Hot work
    • Work over the side
  2. Step 2: Formal check, BEFORE work starts

    Isolations, atmosphere, equipment and rescue arrangements exist.

  3. Step 3: Signed

    Hold

    Work must not begin until the permit is signed off.

  4. Step 4: Work, time-limited

    The permit is time-limited.

  5. Step 5: Closed out

    Cancelled when the work is complete and the area is confirmed safe.

5/5Closed out. The permit is cancelled when the work is complete and the area is confirmed safe.

Schematic · no real permit form implied · COSWP as given on the module sheet · your vessel's SMS and permit forms govern

Say it out loud. Talk “Working aloft and over the side” through with the live Tutor.

Start a live lesson →

Study aid built from primary sources. Verify regulations against the current editions before your oral. An official result needs an MCA assessment.