Deckhand Foundation · Pocket card · Chapter 04
Deck Operations
Your vessel's procedures and senior crew come first.
4.1Radio calls people can use
Right radio. Right channel. One useful message, then give everyone the air back.
- Stop: Do not transmit practice distress, urgency, safety or DSC alerts. Live practice requires the vessel's authorised arrangement.
Job-card checks · 3
- Right radio and assigned channel.
- Listen before transmitting.
- Call the intended station and identify yourself.
4.2Cranes and davits: slow is smooth
No one under the load. One agreed operation. If anything changes, stop before the crane makes the decision for you.
- Stop: No suspended-load or live-control exercise. Do not choose accessories, lifting points or load limits from this course.
Job-card checks · 3
- Plan and role briefing complete.
- Approved load and rig confirmed by responsible crew.
- Equipment checks completed under procedure.
4.3Securing lines to cleats and bollards
Fair lead, clean turns, correct finish. Secure does not mean impossible to operate.
- Stop: Do not reset loaded mooring lines for an exercise or apply a light-line hitch to a heavy system by assumption.
Job-card checks · 3
- Correct fitting and next movement known.
- Lead fair and other lines clear.
- Line-to-cleat size match, turns and finish checked.
4.4Your place in a mooring operation
Know your station. Say what you see. Use words and measurements that let the bridge act.
- Stop: No live manoeuvre or guest operation is required. Keep sample calls off operational radio channels.
Job-card checks · 3
- Role, line and fenders briefed.
- PPE, communication and station checks complete.
- Hazards and escape route understood.
4.5Anchoring: the view from the bow
At the bow, accurate calls beat confident guesses. Follow the command, count the marks and stay outside the machinery's reach.
- Stop: No training anchor drop, free-spool demonstration or live-chain handling. The authorised crew establish isolation.
Job-card checks · 3
- Role, plan and calls briefed.
- Installation training and checks complete.
- Marking scheme confirmed.