Chapter 4 · Lesson 3Practical demonstration · about 4 min read

Securing lines to cleats and bollards

Prepare a fair lead, avoid crossed lines and secure the line using the method ordered for that fitting and load.

Video coming soonSecuring lines to cleats and bollards

The 30-second version

  • Keep thisFair lead, clean turns, correct finish. Secure does not mean impossible to operate.

From the captain

Before you start

A line is not secured just because it has touched a cleat. If the lead is crossed, the turns are piled up or nobody can release it, you have decorated the fitting, not used it.

See it

See it for yourself

Lead before turns

Follow every lead before adding turns. Secure does not mean impossible to operate.

Check the line-to-cleat size match first: a small line can still slip on a large cleat even with a locking turn. Bollard and samson-post methods must suit their own fittings.

Lead before turns. Each line comes fair through its own chock to its own fitting. The turns are readable, the finish suits the line and the second line can still be eased.

Show

Schematic · plan view, not to scale · no line size, cleat ratio or number of turns implied · the vessel's method for each fitting governs

What to look for

  • Look at the next line too

    An attachment can look tidy while trapping another line that must move. Follow every lead before adding turns.

The lesson

The lesson

  1. 01

    Lead before turns

    Check where the line comes from, which fitting it belongs on and whether another line may need to move. Keep the lead fair through the approved chock or fairlead and do not trap a line that may need adjustment.

  2. 02

    Use the onboard method

    For cleats, I use a locking turn on smaller lines and normal figures-of-eight on larger lines. Check the line-to-cleat size match: a small line can still slip on a large cleat even with a locking turn. Keep turns readable and follow the arrangement specified aboard. Bollard and samson-post methods must suit their own fittings; do not copy a cleat finish onto them automatically.

    Two heavy mooring lines come in through a fairlead and are made fast in turns round a polished two-post bollard on a teak deck, seen from above. One line is finished with a locking turn.
    Forward ground lines made fast on the bollard. This line has a locking turn because it is useful in this scenario.
  3. 03

    Secure and still operable

    The finished arrangement must carry the intended load and allow controlled adjustment by the mooring team. Manage the tail without creating bights around feet, blocking a walkway or fouling equipment.

Where it goes wrong

A deckhand adds turn after turn because the line is moving. The pile traps another line and then jams when the officer orders an adjustment. More rope on the fitting has produced less control.

Your call

What would you do?

Pick one, then read the feedback on all three.

The situation

The line you are about to secure crosses over a second line that the officer will need to ease.

Take it aboard

Find the trapped lead

Do this during your induction or first weeks, with the person responsible for your work.

Stop: Do not reset loaded mooring lines for an exercise or apply a light-line hitch to a heavy system by assumption.

Open the activity and job card

Unloaded practice

Use two short training lines and an inert cleat or bollard model.

  1. 01Trace each lead and the next intended movement.
  2. 02Identify the crossed training arrangement.
  3. 03Reset it to the supervisor's method while unloaded.
  4. 04Lay the tail clear of the working route.

What a useful result looks like

  • Neither line is inadvertently trapped.
  • Turns remain readable and the tail is clear.

Deckhand Foundation · Job card

Lead and fitting check

From the lesson: Securing lines to cleats and bollards

  • Correct fitting and next movement known.
  • Lead fair and other lines clear.
  • Line-to-cleat size match, turns and finish checked.
  • Tail clear of feet and machinery.
  • Status reported to the person directing.

Fitting / method

Lead conflict / instruction

Your vessel's procedures and senior crew come first. Nothing on this card is stored.

Quick check

Four questions, then move on

QUESTION 01What do you check before taking turns on a fitting?
QUESTION 02What decides the correct finish on a mooring line?
QUESTION 03Why are excessive turns a problem?
QUESTION 04Where does the loose tail go?

0 of 4 answered

Answer all four to check.