Chapter 3 · Lesson 6Practical demonstration · about 3 min read
The rolling hitch: taking a pull
Learn how a rolling hitch grips along another line, and why load transfer stays a supervised job.
Video coming soonThe rolling hitch: taking a pull
The 30-second version
- Keep thisFace the hitch toward the pull, test the grip and never improvise a live load transfer.
From the captain
Before you start
The rolling hitch is useful when you need a line to grip another line in one direction. The words 'under load' are also your cue not to freelance.
See it
See it for yourself
The rolling hitch
Tie it for the direction of pull: the gripping turns sit toward the expected pull, so the hitch can bite along the standing line. Seen from your side, with the pull running down the standing line.
5/5Dress each turn snugly. The additional turns sit toward the expected pull.Test the grip with light hand tension during training.
Illustration only · Ryan's filmed demonstration and the vessel's method govern
The lesson
The lesson
- 01
Tie for the direction of pull
The additional turns sit toward the expected pull so the hitch can bite along the standing line. Dress each turn snugly and test the grip with light hand tension during training.
- 02
Know what changes the grip
Line material, diameter, condition and load affect performance. A hitch that grips a dry training line may behave differently on a wet, hard or contaminated line.
- 03
Load transfer is commanded
Using a rolling hitch to relieve a loaded line requires a suitable secondary line and strong point, a clear plan and direction from the officer or bosun. Keep everyone clear of both load paths.
Where it goes wrong
A hitch is tied facing the wrong direction and assumed to be holding. As the load transfers, it slides. The crew have created a second moving line instead of controlling the first one.
Your call
What would you do?
Pick one, then read the feedback on all three.
The situation
The hitch grips a dry training rope. You are asked whether that proves it will hold on a wet working line.
Take it aboard
Tie and inspect: Rolling hitch
Do this during your induction or first weeks, with the person responsible for your work.
Stop: Training line only. No person, vessel, lifting system or live load attached. A knot exercise does not establish load capacity or operating authority.
Open the activity and job card
Unloaded practice
Use a short training line at a stable bench. Ask an experienced crew member to check the finished form before practising independently.
- 01Mark the expected pull on the training board.
- 02Tie Ryan's selected form.
- 03Check grip with light hand tension only.
- 04Explain the extra decisions required for a real load transfer.
What a useful result looks like
- You can name one unsuitable use and untie the unloaded example without rushing.
Deckhand Foundation · Job card
Rolling hitch: inspect and choose
From the lesson: The rolling hitch: taking a pull
- Task and required holding or release behaviour understood.
- Line and attachment suitable under the vessel's method.
- Identify the expected pull and the gripping turns in the exact form Ryan demonstrates.
- Tail and finished form checked against the demonstrated method.
- Use limitations explained.
Use / limitation
Inspection feedback
Next repetition
Your vessel's procedures and senior crew come first. Nothing on this card is stored.
Quick check