Deckhand Foundation · Pocket card · Chapter 03

Knots and Ropework

Your vessel's procedures and senior crew come first.

  • Stop: Training line only. No person, vessel, lifting system or live load attached. A knot exercise does not establish load capacity or operating authority. 3.2 · 3.3 · 3.4 · 3.5 · 3.6 · 3.7 · 3.8
  1. 3.1Before you touch the line

    No bights. No line around your body. Stop, look and know where the load can go.

    • Stop: No live mooring line, tension, snap-back demonstration or person inside a loop.
    Job-card checks · 2
    • Role and next command understood.
    • Whole lead and possible movement checked.
  2. 3.2The bowline: useful, not universal

    Know what the bowline does, inspect it properly and never confuse familiar with suitable.

    Job-card checks · 2
    • Task and required holding or release behaviour understood.
    • Line and attachment suitable under the vessel's method.
  3. 3.3The clove hitch: quick and temporary

    Clove hitch: quick, temporary and checked. Do not ask it to be something it is not.

    Job-card checks · 2
    • Check the two turns and crossing against the demonstrated form, with the tail visible.
    • Tail and finished form checked against the demonstrated method.
  4. 3.4Round turn and two half hitches

    Build the friction, finish the hitches and check that the attachment itself is approved for the job.

    Job-card checks · 2
    • Identify the round turn around the fitting and the two dressed half hitches around the standing part.
    • Use limitations explained.
  5. 3.5Joining two lines with a sheet bend

    Tie the sheet bend correctly, but let the job decide whether joining lines is allowed.

    Job-card checks · 1
    • Identify the bight and both working ends; check they finish on the same side in the demonstrated form.
  6. 3.6The rolling hitch: taking a pull

    Face the hitch toward the pull, test the grip and never improvise a live load transfer.

    Job-card checks · 1
    • Identify the expected pull and the gripping turns in the exact form Ryan demonstrates.
  7. 3.7Stopper knots: keep the end in sight

    Tie the stopper before you need it, and make sure it is actually big enough to stop something.

    Job-card checks · 1
    • Identify the dressed figure-of-eight, its tail and whether the finished knot is larger than the sample opening.
  8. 3.8A clean cleat hitch

    A good cleat hitch is clean, appropriate to the load and ready for the next instruction.

    Job-card checks · 1
    • Check the line-to-cleat size match, fair lead and clean turns, with the specified finish and tail clear.
  9. 3.9Working a capstan or winch

    The machine moves the line. The crew control the load. Follow the vessel's sequence without shortcuts.

    • Stop: No independent operation, tensioning or reaching into the drum. Isolation is established by authorised crew.
    Job-card checks · 2
    • Training and authority confirmed.
    • Controls, rotation and stop known.
  10. 3.10The anchor snubber

    Know why the snubber is there. Rig this vessel's system, check it and keep clear while loads transfer.

    • Stop: Do not approach a loaded snubber or rig a new arrangement for the exercise.
    Job-card checks · 2
    • Designated system identified.
    • Lead, attachment and strong points confirmed.
Back to Chapter 3