Chapter 3 · Lesson 4Practical demonstration · about 5 minutes

Round turn and two half hitches

Use friction around a strong point before the finishing hitches do their work.

Video coming soon

Round turn and two half hitches

In the video

  • Friction first
  • Finish it neatly
  • Use it within its limits

From the captain

Before you start

This knot is not glamorous, which is probably why it is useful. The round turn takes the strain; the half hitches stop the arrangement wandering off.

By the end of this lesson

Distinguish the friction turn from the finishing hitches and inspect both parts.

See it

See it for yourself

Round turn and two half hitches

Build the friction, then finish the hitches. Seen from your side, with the standing part leading down to the load.

5/5Dress the two half hitches together.Trace the line path and identify both finishing hitches before calling it complete.

Illustration only · the fitting must be approved for the job · Ryan's filmed demonstration and the vessel's method govern

One pass is not a round turn

Identify the round turn around the fitting: two passes, not one.

Show

A round turn puts two passes around the attachment and creates friction before the finishing hitches.

Illustration only · the fitting must be approved for the job · Ryan's filmed demonstration and the vessel's method govern

What to look for

  • Inspect the finished form

    Identify the round turn around the fitting and the two dressed half hitches around the standing part.

  • Choose the job as carefully as the knot

    The knot does not establish the strength or suitability of the attachment point. Significant loads use the specified system.

The lesson

The lesson

  1. 01

    Friction first

    A round turn puts two passes around the attachment and creates friction before the finishing hitches. It can make an attachment easier to control, but the point itself must be suitable for the intended load.

  2. 02

    Finish it neatly

    After the round turn, form two half hitches around the standing part and dress them together. Trace the line path and identify both finishing hitches before calling it complete.

  3. 03

    Use it within its limits

    A useful example is the vessel-side attachment of a tender line: I prefer a round turn and two half hitches there, while a bowline may be used at the tender end. The line, fitting and release plan still need to suit the actual job. Practise the form unloaded; do not improvise a live release.

Where it goes wrong

The deckhand makes a single pass, thinks it is a round turn and relies on the finishing hitches for the whole job. Under changing load the attachment shifts because the intended friction was never there.

Your call

What would you do?

Pick one, then read the feedback on all three.

The situation

The knot looks correct, but the proposed rail has not been confirmed as an attachment point.

Take it aboard

Tie and inspect: Round turn and two half hitches

Do this during your induction or first weeks, with the person responsible for your work.

Unloaded practice

Use a short training line at a stable bench. Ask an experienced crew member to check the finished form before practising independently.

  1. 01Point out the fitting and standing part.
  2. 02Follow the demonstrated round turn.
  3. 03Add the two half hitches and dress them.
  4. 04Explain the different jobs of the turn and the finish.

What a useful result looks like

  • Identify the round turn around the fitting and the two dressed half hitches around the standing part.
  • You can name one unsuitable use and untie the unloaded example without rushing.

Stop: Training line only. No person, vessel, lifting system or live load attached. A knot exercise does not establish load capacity or operating authority.

Deckhand Foundation · Job card

Round turn and two half hitches: inspect and choose

From the lesson: Round turn and two half hitches

  • Task and required holding or release behaviour understood.
  • Line and attachment suitable under the vessel's method.
  • Identify the round turn around the fitting and the two dressed half hitches around the standing part.
  • Tail and finished form checked against the demonstrated method.
  • Use limitations explained.

Use / limitation

Inspection feedback

Next repetition

Your vessel's procedures and senior crew come first. Nothing on this card is stored.

Quick check

Four decisions, then move on

This check confirms the principle. Your vessel's own induction still comes first.

QUESTION 01What is the main job of the round turn?
QUESTION 02How many half hitches finish the named knot?
QUESTION 03Does knowing this knot authorise you to use any rail as a strong point?
QUESTION 04What should you use for the first tying practice?

0 of 4 answered

Answer all four to check your understanding.