Deckhand Foundation · Pocket card · Chapter 07
Watersports Management
Your vessel's procedures and senior crew come first.
7.1Have a look before you empty the locker
The general check comes first. The exact activity then gets its own limits, equipment, briefing and recovery plan.
- Stop: The officer makes or authorises the operating decision. This exercise does not launch an activity.
Job-card checks · 3
- Activity and participant suitability confirmed.
- Local restrictions and vessel limits checked.
- Observed conditions and likely drift assessed.
7.2Check the bits that keep the guest attached
Lay out the whole setup, inspect every loaded part and remove anything you would not trust with a guest on it.
- Stop: Do not pressurise, energise or tow equipment for this tabletop inspection exercise.
Job-card checks · 3
- Exact equipment set and instructions identified.
- Required components matched.
- Pre-use checks complete.
7.3Before you hand over the PWC
Brief the actual PWC, set the vessel's boundaries and watch the guest demonstrate control before independent use.
- Stop: As a Foundation learner you do not assess or release a real rider independently. No live engine or improvised competence drill is part of the rehearsal.
Job-card checks · 3
- Model, rider authorisation and local restrictions confirmed.
- Activity-specific PPE and engine-stop arrangement explained.
- Actual start, steer, slow, stop and return controls shown.
7.4Brief them without losing them
Keep it specific, demonstrate the important points and make the guest show the critical signals back.
- Stop: No real guests or live tow are needed. Signals must be agreed with the session lead before being taught as the vessel's method.
Job-card checks · 3
- Equipment and starting action shown.
- PPE and equipment-specific cautions covered.
- Area and boundaries understood.
7.5Finish the session properly
Stop in good time. Rinse, inspect and dry. Charge or store batteries only under the correct procedure. Leave no surprises for morning.
- Stop: Do not handle a hot, hissing, leaking or venting battery for this exercise. Follow the alarm and emergency procedure if a real abnormality appears.
Job-card checks · 3
- Recall and recovery complete; people and craft accounted for.
- Equipment-specific aftercare followed.
- Folds, connectors and storage condition checked as instructed.